Hidden drive downtime costs beyond repair invoices
The repair invoice includes equipment and labour. Where is the cost of the stopped line?
Consider a hypothetical example.
A line produces 600 packs per hour. It stops for four hours.
2,400 packs are missing from the production schedule.
That does not automatically mean losing the sales revenue from all 2,400 packs. The output may be recovered later. The question is: at what cost?
An extra shift. Overtime. Express delivery of components. Scrap during restart. Other orders pushed back.
If the output cannot be recovered, the business may face missed deliveries and lost contribution margin.
That is why a repair invoice alone cannot show the full cost of downtime. Calculate separately:
🔹 additional costs of recovery and catching up on production;
🔹 material and product losses;
🔹 lost contribution margin on output that could not be recovered.
Take care not to count the same loss twice.
A lower purchase price does not always mean a lower operating cost. When comparing drives, consider replacement availability, compatibility and the time needed to get the line running again.
Planning a drive upgrade or selecting spare equipment? EnergoStar specialists can help assess options for your production requirements.
📩 info@energostar.net
🌐 www.energostar.net
#EnergoStar #Downtime #Manufacturing #OperationalEfficiency